Şanlıurfa Paşabağı Irrigation
Scope of work
Construction of 5,874.71 m of GRP and 1,602.61 m of HDPE pipeline, with all appurtenant structures, to irrigate 400 hectares with Q = 600 l/s taken from the main canal through a vacuum water intake; and a 6,192.62 m GRP pipe conveyance line carrying 1,000 l/s.

