Sadak Dam Irrigation
Scope of work
Laying of irrigation pipes for the conveyance line, main pipeline, network and laterals (300 km – 7,100 hectares); 3 pressure-break valve chambers and other appurtenant structures; access and service roads; drainage channel, stream and road crossings; horizontal drilling.





