Göygöl Water Intake – Ganja Transmission Line and 4,000 m³ Reservoir
Scope of work
Water intake; drinking water transmission line with the structures along the line; 3 pressure-break chambers; a 4,000 m³ reservoir and a chlorination unit; landscaping.