Gaziantep Central District Yamaçoba Small Dam and Irrigation
Scope of work
Grouting, 0.70 hm³ of embankment fill, an uncontrolled frontal-overflow spillway, a modified flip-bucket-type bottom outlet with a Ø2000 mm conduit, a 53-hectare piped irrigation network and appurtenant structures.



