Antalya – Göynük Water Reservoir and Transmission Lines
Antalya
- Status
- Completed
- Field of activity
- Water Supply and Sewerage
- Location
- Antalya
- Client
- Development Bank of Türkiye
- Contractor
- Haselsan
- Contract date
- 28 August 1992
- Provisional acceptance
- 30 November 1993
Scope of work
Laying of 20,571 m of Ø150–700 mm steel pipe and construction of 3,000 m³ and 500 m³ reinforced-concrete water reservoirs, together with appurtenant structures.
Other projects in this field
Kabul Drinking Water Supply WorksKabul, Afghanistan
Osmancık (Çorum) Water Supply ProjectÇorum
Çakırhöyük (Adıyaman) Water Supply WorksAdıyaman
Gölbaşı (Adıyaman) Water Supply WorksAdıyaman
Giresun (Central District) Water Supply WorksGiresun
Düzce (Bolu) Additional Water Supply Network WorksDüzce
Emet (Kütahya) Water Supply WorksKütahya
Kutludüğün (Ankara) Water Supply WorksAnkara
Düzce (Central District) Water Supply WorksDüzce
Hasançelebi (Malatya) Water Supply WorksMalatya
Kocaözü (Malatya) Water Supply WorksMalatya
Aksaray Organised Industrial Zone (OSB) Infrastructure WorksAksaray
Karaman (Central District) Wastewater Treatment PlantKaraman
Uluborlu (Isparta) Sewerage WorksIsparta
Samsun (Central District) Water Supply WorksSamsun
Adıyaman (Central District) Wastewater Treatment PlantAdıyaman
Karaman Wastewater Treatment Plant Completion WorksKaraman
Ömerli – Şeyhli – Darıca – Pendik Water Transmission Line, Section 1Water Supply and Sewerage
Horasan (Erzurum) Sewerage WorksErzurum
Kemeraltı Area (İzmir) Sewerage and Water Supply Worksİzmir
Sivas Central District Stormwater Drainage System and Wastewater ConnectionsSivas
Güzelyurt Sewerage and Water SupplyGüzelyurt
Göygöl Water Intake – Ganja Transmission Line and 4,000 m³ ReservoirGanja, Azerbaijan
Ganja 3 – Rehabilitation and Construction of Ganja Water Supply and Sewerage LinesGanja, Azerbaijan
Avcılar District Drinking Water and Wastewater Construction, Maintenance and Repair Works (2016)Istanbul