Adıyaman (Central District) Wastewater Treatment Plant

Adıyaman

Status
Completed
Field of activity
Water Supply and Sewerage
Location
Adıyaman
Client
İller Bankası (Bank of Provinces)
Contractor
Haselsan
Contract date
15 September 1995
Provisional acceptance
31 May 2000

Scope of work

Construction of a biological wastewater treatment plant. Central plant: trickling filter process, design flow 412 l/s. Small plant: stabilisation pond process, design flow 95.90 l/s.

Other projects in this field

Kabul Drinking Water Supply WorksKabul, Afghanistan Osmancık (Çorum) Water Supply ProjectÇorum Çakırhöyük (Adıyaman) Water Supply WorksAdıyaman Gölbaşı (Adıyaman) Water Supply WorksAdıyaman Giresun (Central District) Water Supply WorksGiresun Düzce (Bolu) Additional Water Supply Network WorksDüzce Emet (Kütahya) Water Supply WorksKütahya Kutludüğün (Ankara) Water Supply WorksAnkara Düzce (Central District) Water Supply WorksDüzce Hasançelebi (Malatya) Water Supply WorksMalatya Kocaözü (Malatya) Water Supply WorksMalatya Antalya – Göynük Water Reservoir and Transmission LinesAntalya Aksaray Organised Industrial Zone (OSB) Infrastructure WorksAksaray Karaman (Central District) Wastewater Treatment PlantKaraman Uluborlu (Isparta) Sewerage WorksIsparta Samsun (Central District) Water Supply WorksSamsun Karaman Wastewater Treatment Plant Completion WorksKaraman Ömerli – Şeyhli – Darıca – Pendik Water Transmission Line, Section 1Water Supply and Sewerage Horasan (Erzurum) Sewerage WorksErzurum Kemeraltı Area (İzmir) Sewerage and Water Supply Worksİzmir Sivas Central District Stormwater Drainage System and Wastewater ConnectionsSivas Güzelyurt Sewerage and Water SupplyGüzelyurt Göygöl Water Intake – Ganja Transmission Line and 4,000 m³ ReservoirGanja, Azerbaijan Ganja 3 – Rehabilitation and Construction of Ganja Water Supply and Sewerage LinesGanja, Azerbaijan Avcılar District Drinking Water and Wastewater Construction, Maintenance and Repair Works (2016)Istanbul